Damp Coat

Features

Ease of Application
Brush/Roller/Spray

Potable Water Safe

Multi Surface Application

Water Pressure Resistance

How to apply

Step 1

Remove efflorescence, existing painting system and reach the plaster/brick surface. Repair & clean the surface.

Step 2

Add water to liquid (1 Ltr damp coat add 20% of fresh water) and mix well.

Step 3

Apply 2 coats of damp coat recommended coverage on saturated dry surface. Keep a gap of 6-8 hours between each coat.

Step 4

Apply plaster/putty and continue normal painting process using Ujala paints.

Product Information Sheet